Recently Completed Works
Lake Turkana Substation and Distribution Lines
33kV/400kV Loyangalani Substation. Installation of HV & LV Switchgear Panels, Cable Laying, Termination, 9x45MWA Transformer Installation, Oil filtration and pre-commissioning, Steel Structure installation, Equipment installation i.e Circuit breakers, Disconnectors, CT’s, VT’s; Earthing of equipment and facilities.
Last Mile Connectivity Project
Contract No. A40. Design & Survey, Procurement & Supply of all Line materials, LV Accessories, Protection, Conductors and All the necessary Installation works & Commissioning Tests to the Customers in Lot 6 – Mandera, Wajir & Marsabit – 284km. Over 5,200 customers connected.
Overhead Transmission
33kV Line for the Collection Grid. Procurement & Supply of 33kV Hardware Materials, Installation of 33kV Network and commissioning of lines to the grid – 150km
Client | Project Name & Description |
---|---|
Siemens SAS, France | Lake Turkana Wind Power Project – 33kV/400kV Loyangalani Substation. Installation of HV & LV Switchgear Panels, Cable Laying, Termination, 9x45MWA Transformer Installation, Oil filtration and pre-commissioning, Steel Structure installation, Equipment installation i.e Circuit breakers, Disconnectors, CT’s, VT’s; Earthing of equipment and facilities |
Siemens SAS, France | Lake Turkana Wind Power Project – 33kV Line for the Collection Grid. Procurement & Supply of 33kV Hardware Materials, Installation of 33kV Network and commissioning of lines to the grid – 150km |
Kenya Power & Lighting Co. Ltd | Last Mile Connectivity Project (Lot 6) – Contract No. A40. Design & Survey, Procurement & Supply of all Line materials, LV Accessories, Protection, Conductors and All the necessary Installation works & Commissioning Tests to the Customers in Lot 6 – Mandera, Wajir & Marsabit – 284km. Over 5,200 customers connected. |